Progress continues to be made at Queen & Ashbridge! After a long winter of excavation, ground floor formwork is primarily complete and formwork on the 2nd floor is about 50% complete.
We are happy to report that Toronto Hydro has mobilized for our temporary site power which means that the site generators will soon be removed once power is connected to the site.
There will continue to be a large volume of concrete and rebar deliveries to the site as structure progresses and the primary activity on site from now through the summer will be formwork as the structure takes shape.
It may not look like much right now but above is a sneak peak from inside the condo elevator lobby and ground floor corridor. Stay tuned for more updates as Queen & Ashbridge continues to take shape!